ORA–ZED Compound Project

Integrated Steel, Concrete & Turnkey Hangar Execution

Surveying, Design & Site Preparation​

The project started with accurate surveying, engineering planning, and site preparation to create a solid foundation for organized construction execution.

1
2

Excavation, Leveling & Concrete Foundations

This phase focused on excavation, earthworks, leveling, and reinforced concrete foundation works to support structural execution.

Steel Structure & Hangar Execution

The steel works phase included fabrication, installation, and structural assembly for the hangar, executed with precision from base structure to main steel frame.

whatsapp image 2026 05 09 at 8.51.46 pm
4 ai

Turnkey Completion & Final Handover

The final phase included completing all hangar works, site organization, inspections, and preparing the project for turnkey delivery.